- Chemical Storage Equipment[4]
- Stainless Steel Pipes[2]
- Beverage Processing Machinery[9]
- Pumps[10]
- Other Food Processing Machinery[8]
- Pasteurizer[1]
- Mixing Equipment[10]
- Pipe Fittings[10]
- Cast & Forged[2]
- Valves[10]
- Beverage Processing Machinery Parts[9]
- Other Aquaculture Equipment[1]
- Other Industrial Filtration Equipment[4]
- Heat Exchanger[1]
- Water Treatment[1]
- Drains[1]
- Clamps[1]
- Contact Person : Mr. Wei Runner
- Company Name : Wenzhou L&B Fluid Equipment Co., Ltd.
- Tel : 86-021-54938956-808
- Fax : 86-021-39651005
- Address : Shanghai,Shanghai,Room 801 , Building NO.29,Sub-lane 111 , Lane 7580 , Humin Road , Minhang District
- Country/Region : China
- Zip : 201102
stainless steel tube
sanitary tube 316 stainless steel tube stainless steel square tube
Steel material: AISI 201/202/304/304L/316/316L 1. Our ASTM A554 stainless steel tubes including: running water pipes; 2.Material: AISI 201/202/304/304L/316/316L 3. Size: (6mm-159mm) OD X (0.22mm-3mm) WT X 4000-7000mm) LONG4. Uses: for running water system, furniture, railings, yacht, marine, towel dryer, window guards, ship building,heater exchange, container,water and so on5. Length: 4-7m random or fixed.such as 5.8m fixed,6m fixed,5-7m randometc.6. Process Method: cold drawn,cold-rolling7. Polishing: 600#,400#, 320#, 240#, 180#.etc.8. Welding line type: tig welded and protected by Nitrogen.9. Quality guarantee: The Roundness is very accurate; The inner angle and outer angle of square tubes are both sharp 90°; Our raw materials are all from the largest steel factories in China and are of excellent quality; When packaging, every single pipe is moved one by one by workers to protect the finish from extra scratches; Both ends of the pipes are very clean and with no burr; Every pipe is polished two times at least to ensure the pipes are bright enough.
Please contact our After-sales service department in time within 30days after you received the cargo. | |
Tel: 0086-021-54938956-808 Time: 9:00 a.m.- 6:00 p.m. (Beijing time) | |
Process | Please provide the copy of Sales Contract and describe the problems appeared. |
Problems confrimation: | |
Slight problem: | Please send the proof to our After-Sales Department, we will reply within two days. |
Serious problem: | |
a | We will dispatch our Quality and Problems Appraisers to make a confirmation. |
b | Have a negotiation of the compensation and sign agreements |
c | Our After-Sales Department will perform the duties as the agreements |
stainless steel tube